1. Installation By drawing on-site precast concrete foundation, according to the size of the reserve a fixed bolt hole (see "Rasper foot drawings"), concrete foundation must be smooth, level. When Rasper installed in its final position, make sure the holes for the fixing bolts located in the center, and check whether the machine perfectly level (important !!). According to the provisions of second...
Working condition 1.temperature:0~40℃; 2.humidity≤70%; 3.Operating Voltage:380V,frequency:50Hz(different design for different contries). Installation, operation and maintenance 1. Installation According to process requirements that install chopper in the exact location. It shall be placed in a horizontal position. Fix the disc distributor feeder and silo after adjust the horizontal position. 2. Op...